Home / Blog

By Roberto Quinones, owner of KYN Hauling LLC · North Port, FL · Updated November 26, 2026

For an asphalt shingle tear-off that finishes in one day and stays under 3 tons, the 24-hour roofing dumpster ($450, approved contractor accounts) costs $100 less than the 7-day roofing plan ($550). If there is a real chance the job runs into a second day, book the 7-day plan: a 24-hour bin kept longer is billed at the 7-day rate anyway.

Key facts

  • 24-hour roofing plan: $450, 24 hours, approved contractor accounts only
  • 7-day roofing plan: $550, open to contractors and homeowners
  • Both: up to 3 tons flat, no overage; 3 tons is the maximum load
  • Over 3 tons on either plan: swap $175
  • Kept past 24 hours: billed at the 7-day rate ($550)
  • Asphalt shingle only in the 20-yard; tile and heavy roofing go in the 10-yard (coming soon)
  • North Port and Port Charlotte base price; Punta Gorda +$10, Englewood +$15

If you run a roofing crew in North Port, Port Charlotte, Punta Gorda or Englewood, the dumpster is one of the few costs on a re-roof you can actually control. KYN offers two ways to handle asphalt shingle tear-off debris in a 20-yard roll-off: a 24-hour roofing plan at $450 for approved contractor accounts, and the standard 7-day roofing plan at $550. Both include up to 3 tons, both have no overage charge, and both are delivered and picked up by the same local owner-operated company. The difference is time, and time is where most roofing budgets leak.

This guide walks through when the shorter plan saves you money, when it quietly costs you more, and how to plan the tear-off day so the 24 hours actually count.

The two roofing plans, side by side

Both plans are for asphalt shingle debris in the 20-yard dumpster; the 24-hour plan trades time for a $100 lower price. Here is how they compare, straight from KYN's published terms.

24-hour roofing plan7-day roofing plan
Price$450$550
Who can book itApproved contractor accounts onlyContractors and homeowners
Time on site24 hours7 days
WeightUp to 3 tons flat, no overage (3 tons is the maximum)Up to 3 tons flat, no overage (3 tons is the maximum)
MaterialAsphalt shingle onlyAsphalt shingle (tile and heavy roofing go in the 10-yard, coming soon)
Kept longer?Billed at the 7-day rate ($550)Extra days $15 each for approved accounts ($20 otherwise)
More than 3 tons?Swap, $175Swap, $175
How it is paidInvoiced on account terms, not paid onlineOnline or on account
KYN Roll-Off hook-lift truck lifting a 20-yard roll-off dumpster at the yard in Southwest Florida
A KYN hook-lift truck loading a 20-yard roll-off. The same truck that drops your bin is the one that swaps it.

When the 24-hour plan wins

The 24-hour plan wins when the whole tear-off fits in one working day and stays under 3 tons. On those jobs you save $100 per roof, and on a crew that tears off several roofs a month that adds up fast.

Single-day tear-offs

Many residential re-roofs in our area come off in a single day with a full crew. If your foreman is confident the old roof is off and in the bin by the end of the day, there is no reason to pay for six more days of a dumpster sitting in the driveway. The bin arrives, the crew loads it, and it leaves.

Crews that stage dry-in the same day

Roofers who tear off and dry-in on the same day already plan around a tight clock. A one-day bin fits that rhythm: nothing is left on the ground overnight, and the homeowner gets the driveway back sooner. That matters in HOA neighborhoods and on narrow streets.

Predictable, repeat work

If your jobs look alike week to week, you learn quickly which roofs fit in one bin and one day. That is where an account pays off: the 24-hour plan is only available to approved contractor accounts, and it is invoiced on your account terms instead of paid at the door.

When the 7-day plan is the safer bet

Choose the 7-day plan when there is any real chance the tear-off spills into a second day. If a 24-hour bin stays longer than 24 hours, it is billed at the 7-day rate anyway, so you lose the savings and gain nothing.

Multi-day and larger roofs

Bigger homes, complicated roof lines, smaller crews or a second job running in parallel can turn a one-day plan into two or three. If the schedule is not certain, book the 7-day plan from the start and work at your own pace.

Florida weather

Summer afternoon storms are part of roofing in Southwest Florida. When weather stops a tear-off halfway, a 7-day bin keeps you covered while you wait for a dry window. With the 24-hour plan, a rain delay simply moves you to the 7-day price.

Inspections, rot and surprises

Decking repairs, extra layers you did not expect, or waiting on an inspection can all stretch a job. The 7-day plan gives you room for the unexpected without changing your dumpster bill.

The math in real numbers

The 24-hour plan saves exactly $100 when the job finishes on time and costs the same as the 7-day plan when it does not. There is no penalty beyond losing the discount, which is why it is a low-risk choice for confident crews.

Two things change the math more than the plan you pick. The first is weight: roofing loads are limited to 3 tons per container in either plan, and anything over that needs a swap at $175. The second is delivery distance: Punta Gorda adds $10 and Englewood adds $15 per delivery, while North Port and Port Charlotte are at the base price. For contractors, city adjustments are confirmed when the account is set up.

Roofing debris is a real part of the waste stream. The U.S. EPA counts asphalt shingles among the construction and demolition materials it tracks, and estimated that 600 million tons of construction and demolition debris were generated in the United States in 2018. Planning the bin well is not a small detail on a roofing job; it is part of running the job.

Plan the tear-off day so the 24 hours count

The 24 hours only save money if the bin is in place when the crew starts and loaded when they finish. A few habits make that happen.

  • Book ahead and confirm the drop time. The owner confirms every delivery time. Ask for the drop window that fits your start time, so the clock is not running before your crew arrives.
  • Pick the spot before the truck shows up. The bin needs a clear, level place on the driveway. Driveway protection boards are free; ask for them.
  • Load to the fill line, not above it. Shingle loads must stay at or below the marked fill line. A dumpster loaded over the rim or fill line can be refused at pickup and carries a $150 overfill charge.
  • Spread the load evenly. Unbalanced or top-heavy loads can be refused at pickup. Even loading also helps the bin hold more.
  • Call the swap early. If you can see the roof will go past 3 tons, call for the swap while the crew is still working, so the empty bin arrives before the full one becomes a problem.
KYN 20-yard roll-off dumpster on the hook-lift truck showing the loading level sticker that marks the fill line
The "loading level" sticker marks the fill line on a KYN 20-yard. Roofing loads stay at or below it.

Weight, the fill line and swaps

On roofing plans, 3 tons is both what you get and the most the bin can carry. There is no per-ton overage on roofing: the price is flat up to 3 tons. If the debris goes beyond that, the answer is a swap ($175): the full bin goes out and an empty one comes back on the same trip.

That is also why only asphalt shingle goes in the 20-yard. Tile and heavy or multi-layer roofing are much heavier for the same volume, so KYN handles them only in the 10-yard dumpster, which has lower walls and is coming soon. Until it is available, call (561) 878-1535 to talk through a tile or heavy roof.

From the owner

I deliver and pick up every KYN dumpster myself, so the person you call is the person who shows up. A few things I have learned working with roofing crews:

  • Tell me your start time when you book. I would rather drop the bin a little earlier than have your crew waiting on me.
  • If you think the roof is close to 3 tons, call me during the day. A swap on the same trip keeps the job moving.
  • Keep the shingles at or below the loading level sticker. It protects the truck, the road and your schedule at pickup.

Frequently asked questions

Who can book the 24-hour roofing dumpster?

Only approved KYN contractor accounts. It is invoiced on your account terms and is not paid online. Homeowners and contractors without an account can book the 7-day roofing plan at $550.

What happens if I keep the 24-hour roofing dumpster longer than 24 hours?

It is billed at the Roofing 7-day rate of $550. You lose the $100 savings, but there is no extra penalty.

Is there an overweight charge on roofing dumpsters?

No. Roofing plans are flat up to 3 tons, and 3 tons is the maximum load. If the debris goes over 3 tons, you need a swap for $175.

Can tile roofing go in the 20-yard roofing dumpster?

No. Tile and heavy or multi-layer roofing are accepted only in the 10-yard dumpster, which is coming soon. Call (561) 878-1535 to talk through a tile or heavy roof.

How much are extra days on the 7-day roofing plan?

Extra days are $15 each for approved contractor accounts and $20 each otherwise.

Do you deliver roofing dumpsters in Punta Gorda and Englewood?

Yes. North Port and Port Charlotte are at the base price; Punta Gorda adds $10 and Englewood adds $15 per delivery.

Sources

  1. KYN Roll-Off — Terms & Conditions (sections 1.3, 1.5 and 3.2)
  2. KYN Roll-Off — Pricing
  3. KYN Roll-Off — Contractor accounts
  4. KYN Roll-Off — Contractor rate sheet (PDF)
  5. U.S. EPA — Construction and Demolition Debris: Material-Specific Data

Roofing crew in North Port, Port Charlotte, Punta Gorda or Englewood? Open a contractor account to book the 24-hour roofing plan, download the contractor rate sheet, or call (561) 878-1535.

Book in 2 Minutes

Ready to clear
the mess?

Book online, get instant confirmation. Contract and receipt handled automatically. We handle the rest.

Book Your Dumpster Now
Call Now